Energia i regulacje · 17/11/2014
Omaha Public Power District; Fort Calhoun Station, Unit 1
The U.S. Nuclear Regulatory Commission (NRC) is considering issuance of an amendment to Renewed Facility Operating License No. DPR- 40, issued to Omaha Public Power District (the licensee), for operation of the Fort Calhoun Station, Unit 1. The proposed amendment would revise a limited number of Technical Specification Surveillance Requirements by adding a note or footnote permitting a one-time extension from a refueling frequency (i.e., at least once per 18 months) to a maximum of 28 months.