Regulation & law · 08/10/2009
FERC Extends Deadline for Bulk Power System Reliability Standards
The Federal Energy Regulatory Commission (FERC) has extended the deadline for utilities to implement the Mandatory Reliability Standards for the Bulk Power System, a set of regulations aimed at ensuring the reliability of the US power grid. The new deadline is now set for 2025, up from the original 2023 date.