BN Business News
Add your company to Business Communicator →

Regulacje i polityka gospodarcza · 12/5/2008

Northwest Area Water Supply Project, ND

Pursuant to the National Environmental Policy Act of 1969 (NEPA), the Bureau of Reclamation (Reclamation) is notifying the public that Reclamation has prepared a Final EIS on Water Treatment for the Northwest Area Water Supply Project (Project). The proposed action is to construct a biota water treatment plant for the Project to treat the source water from Lake Sakakawea before it is delivered into the Hudson Bay basin. The Final EIS provides information and analyses related to four water treatment alternatives that would further reduce the risk of a Project-related biological invasion from the Missouri River basin into the Hudson Bay basin. Reclamation published a Draft EIS on December 21, 2007. The public comment period continued through March 26, 2008. Revisions were made in the Final EIS to incorporate responses to comments and identify the preferred alternative and the associated cost estimate. However, these revisions do not significantly impact the analysis or results presented in the Draft EIS. The Final EIS includes written responses to all public comments on the Draft EIS.

Original source language: Federal Register — All DocumentsOpen original release →