Regulacje i polityka gospodarcza · 16/11/2006
Drawbridge Operation Regulation; Illinois Waterway, Illinois
The Coast Guard has revised its proposal to change the operation of the Pekin Railroad Drawbridge, Mile 151.2, at Pekin, Illinois and the Chessie Railroad Drawbridge, Mile 254.1 at Seneca, Illinois across Illinois Waterway. The present regulation requires revision to reflect the actual procedures that have always been followed. The current regulation was intended to be temporary, for test purposes only, and was inadvertently permanently included. The revision would eliminate the "Specific Requirements" for remote operation and the bridge would continue to operate, as required by the Coast Guard, under the "General Requirements". In addition the Coast Guard proposes to change the regulation governing the operation of the Chessie Railroad Drawbridge across the Illinois Waterway, Mile 254.1, at Seneca, Illinois. The existing regulation requires the drawspan to open on signal. This change is necessary to reflect a change in operating procedure.