International trade · 29/10/2004Updated: 10/17/2026 · 1 min read
U.S. Extends Time Limits for Review of Korean Corrosion-Resistant Steel Imports
Summary
The U.S. Trade Representative's office has extended time limits for the final results of an antidumping administrative review and a new shipper review of Korean imports of corrosion-resistant carbon steel flat products.