Energia i regulacje · 27/05/2004
Nuclear Regulatory Commission Issues Notice on Proposed Change to Control Rod Scram Time Testing Frequency for General Electric Boiling Water Reactors
The Nuclear Regulatory Commission has issued a notice requesting public comment on a proposed change to the testing frequency for control rod scram times in Standard Technical Specifications 3.1.4 for General Electric Boiling Water Reactors, as part of the Consolidated Line Item Improvement Process.