Bezpieczeństwo i regulacje · 4/27/2004
Drawbridge Operation Regulations; Chelsea River, MA
The Coast Guard proposes to temporarily change the drawbridge operating regulations governing the operation of the P.J. McArdle Bridge, mile 0.3, across the Chelsea River between East Boston and Chelsea, Massachusetts. This proposed rule would allow the bridge to need not open for the passage of vessel traffic from 10 a.m. to 5 p.m. on June 5, 2004, to facilitate the First Annual Chelsea River Revel 5K Road Race. Vessels that can pass under the bridge without a bridge opening may do so at all times.