Regulacje i polityka gospodarcza · 12/12/2003
Intent To Prepare a Draft Environmental Impact Statement for a Proposed Reservoir Operating Plan in Conjunction With the Reservoir Operating Plan Evaluation Study for the Mississippi Headwaters
The headwaters region of the Mississippi River, located in north-central Minnesota, contains a number of reservoirs operated by various private and public entities, including the Corps of Engineers (Corps) and the U.S. Forest Service (Forest Service). The current operating plans for the Corps and Forest Service reservoirs were developed over 40 years ago and are in need of revision because of changes in environmental, social, and economic conditions in the region. It is unlikely that the current operating plans provide the greatest net benefit to the resources of the whole system. Furthermore, the operations of the non-Federal (State and privately owned) reservoirs are not coordinated with the Federal reservoir operations. This hinders system-wide objectives such as flood damage reduction for properties adjacent to and downstream of the reservoirs. The proposed action is to develop a coordinated system-wide operational plan for implementation by the Corps and the Forest Service with recommendations for the operations of the non-Federal dams. The goal of this proposed action is to optimize the system benefits for all affected resources. Some resources may be adversely affected as a