Energia i regulacje · 22.10.2003
Notice of Availability of Model Application Concerning Technical Specification Improvement Regarding Extension of Reactor Coolant Pump Motor Flywheel Examination for Westinghouse Plants Using the Consolidated Line Item Improvement Process
Notice is hereby given that the staff of the Nuclear Regulatory Commission (NRC) has prepared a model safety evaluation (SE), a model no significant hazards consideration (NSHC) determination, and a model application relating to a change in the technical specification (TS) required inspection interval for reactor coolant pump (RCP) flywheels at Westinghouse-designed reactors. The purpose of this model is to permit the NRC to efficiently process amendments that propose to extend the inspection interval for RCP motor flywheels. Licensees of nuclear power reactors to which the model applies may request amendments using the model application.