Regulacje i polityka gospodarcza · 13/09/2002
Right of Way Request, Environmental Assessment or Environmental Impact Statement, Chesapeake and Ohio Canal National Historical Park
The National Park Service (NPS) is evaluating a right-of-way (ROW) request by Duke Energy Frederick, LLC, of Houston, Texas, for construction of two pipelines across the Chesapeake and Ohio Canal National Historical Park (C&O Canal NHP). The four alternative locations proposed for the placement of the ROW are between mileposts 45 and 47 along the canal near the community of Point of Rocks in Frederick County, Maryland. Each of the alternatives is approximately 60 feet in width by 300 feet to 1150 feet in length. The power generating facility itself is not adjacent to the park but is approximately 7,700 feet from the park boundary. The proposed power generating facility is subject to licensing and permitting by the state of Maryland. The proposed pipelines will provide water for cooling and other purposes for two gas and one steam turbine generators with a combined output of 640 MW. One 24-inch raw water pipeline will withdraw a maximum of 7.5 million gallons per day from the Potomac River while a second 10-inch pipeline will return approximately 0.8 million gallons per day. Consistent with the requirements of the National Environmental Policy Act of 1969 (NEPA), NPS is soliciting c