Regulacje i polityka gospodarcza · 28.10.2002
Drawbridge Operation Regulations: Taunton River, MA
The Commander, First Coast Guard District, has issued a temporary deviation from the drawbridge operation regulations for the Brightman Street Bridge, mile 1.8, across the Taunton River between Fall River and Somerset, Massachusetts. This deviation from the regulations allows the bridge to open only one lift span for the passage of vessel traffic from 9 p.m. on November 8, 2002 through 4 p.m. on November 22, 2002. During this deviation the Fall River lift span will remain in the closed position for vessel traffic and the Somerset lift span will be fully operational at all times. This deviation is necessary to facilitate scheduled maintenance at the bridge.