BN Business News
Add your company to Business Communicator →

Regulacje i polityka gospodarcza · 31.10.2002

Intent To Prepare a Draft Environmental Impact Statement for Providing a Deeper and Wider Navigation Channel to the Port of Iberia Through the Enlargement of Existing Access Channels, in Vermilion and Iberia Parishes in the Vicinity of New Iberia and Intracoastal City, LA

The U.S. Army Corps of Engineers (Corps), New Orleans District, is initiating this study under the authority of section 431 of the Water Resources Development Act of 2000 (Pub. L. 106-541), dated December 11, 2000, to determine the feasibility of deepening and widening the navigation channel to the Port of Iberia (hereafter referred to as "the Port") through the enlargement of existing access channels. Deepwater oil and gas exploration and development in the Gulf of Mexico and other deepwater areas has increased because of growth in demand; depletion of existing oil and gas fields, including those in the shallower areas of the gulf; and advancements in deepwater drilling technologies that include larger platforms. The Port was constructed by Iberia Parish to provide a navigation outlet for trade and transportation of offshore fabrication modules. South Louisiana and the Port have a long association with the development of offshore oil and gas industry worldwide. The Port is primarily a landlocked port with connections to the Gulf of Mexico through the Commercial Canal and the Acadiana Navigation Channel. Additionally, the current project provides a "Harbor of Refuge" during storms

Source: Federal Register — All DocumentsOpen original release →