Regulacje i polityka gospodarcza · 11/09/2001
Robert Douglas Willis Power Rate Schedule
The Robert Douglas Willis Hydropower Project will see an increase in power rates, following approval from the Deputy Secretary of Energy, as outlined in the Rate Order No. SWPA-46, which was placed into effect on an interim basis in November 1999.