Regulacje i polityka gospodarcza · 20.09.2000
Drawbridge Operation Regulations; Milford Haven, VA
The Commander, Fifth Coast Guard District, has approved a temporary deviation from the regulations governing the operation of the Gwynns Island Drawbridge across Milford Haven, mile 0.1, in Grimstead, Virginia. Beginning at 6 a.m. on September 25, through 6 p.m. on November 23, 2000, the bridge may remain in the closed position. This closure is necessary to encapsulate the entire bridge structure for painting.