Regulacje i polityka gospodarcza · 24/10/2000
Environmental Impact Statement on the South Central Corridor Light Rail Transit Project in Metropolitan Louisville, Kentucky
The Federal Transit Administration (FTA), in cooperation with the Transit Authority of River City (TARC), intends to prepare an Environmental Impact Statement (EIS) for the Louisville South Central Corridor Rapid Transit Project in accordance with the National Environmental Policy Act (NEPA). The EIS will consider alternatives for improving rapid transit service within an approximately 15-mile-long corridor that begins at the Ohio River in the Louisville Central Business District (CBD) and proceeds through the Medical Center; through Smoketown and Shelby Park; through the University of Louisville campus and the Louisville International Airport and ends on the west side of I-65 near the Gene Snyder Freeway/Interstate 65 interchange. The EIS will evaluate the following alternatives: a No-Build Alternative, a Transportation Systems Management (TSM) Alternative consisting of low to medium cost improvements to local bus services and facilities, Light Rail Transit (LRT) Alternatives, any additional reasonable alternatives identified during the EIS scoping process. The LRT alternatives will include a supporting bus plan. The Major Investment Study (MIS) for this project, the Transportatio