Regulacje i polityka gospodarcza · 13/11/1998
Proposed Rate Schedule Changes
The Administrator, Southwestern Power Administration (Southwestern), has determined that minor revisions to the terms and conditions within existing rate schedules NFTS-98 and P-98A are required. Since the proposed changes to the rate schedules are associated with the terms and conditions of service, the net results of the 1997 Integrated System Power Repayment Studies, which was the basis for the existing rate schedules, will not be altered. Southwestern held informal meetings with customers to discuss proposed changes and to provide opportunity for input in the development of these changes.