Regulation & law · 22/10/1997Updated: 10/17/2026 · 1 min read
U.S. Extends Timeframe for Preliminary Results of Antidumping Review on Steel Wire Rope from Mexico
Summary
The U.S. Commerce Department has extended the deadline for preliminary results of an antidumping administrative review on steel wire rope imports from Mexico, which was originally set to be released on October 17, 2023.
Original source language: Federal Register — All DocumentsOpen original release →