Transport i infrastruktura · 12/12/1994
Drawbridge Operation Regulations, St. Croix River, MN and WI
The Coast Guard is changing the regulation governing the operation of the S36 Bridge over the St. Croix River at mile 23.4, at Stillwater, Minnesota. The existing regulation was temporarily amended for the 1994 St. Croix River boating season because the previous opening schedule was contributing to traffic delays and congestion in Stillwater. This revised opening schedule was evaluated through the 1994 St. Croix River boating season. As a result of traffic studies and evaluations, a new opening schedule is being implemented to reduce traffic delays and congestion.