Zasoby i środowisko · 10/08/2012
Potential Commercial Leasing for Wind Power on the Outer Continental Shelf (OCS) Offshore Maine; Request for Interest
The purpose of this public notice is to: (1) Describe the proposal submitted to BOEM by Statoil North America (Statoil NA) to acquire an OCS wind lease; (2) solicit public input regarding the proposal, its potential environmental consequences, and the use of the area in which the proposed project would be located; and (3) solicit submissions of indications of competitive interest for a commercial lease for wind energy development on the OCS off the coast of Maine for the area identified in this notice. On October 12, 2011, BOEM received an unsolicited request from Statoil NA for a commercial wind lease on the OCS offshore Maine. Statoil NA's proposed project, "Hywind Maine," would consist of four 3-megawatt (MW) wind turbine generators (WTG) configured for a total of 12-MW in water depths greater than 100 meters and be located approximately 12 nautical miles (nmi) off the coast of Maine. The objective of the proposed Hywind Maine Project is to demonstrate the commercial potential of the existing floating offshore Hywind technology, while responding to a corresponding Request for Proposals (RFP) issued by the Maine Public Utilities Commission. This request for interest is published