Zasoby i środowisko · 11/05/2011
Interior Department to Consider Non-Federal Hydroelectric Power Development at Central Utah Project
The Department of the Interior, in collaboration with the Department of Energy and Western Area Power Administration, is seeking proposals for non-Federal development of hydroelectric power at the Spanish Fork Flow Control Structures of the Central Utah Project, with the goal of generating environmentally sustainable hydropower.