Energia i gospodarka · 29.09.2011
Record of Decision, Texas Clean Energy Project
The U.S. Department of Energy (DOE) announces its decision to continue to provide financial support to the Texas Clean Energy Project (TCEP). DOE prepared an Environmental Impact Statement (EIS) (DOE/EIS- 0444) to assess the environmental impacts associated with the TCEP, a project that Summit Texas Clean Energy, LLC (Summit) would design, construct, and operate. The project will demonstrate advanced power systems using integrated gasification combined-cycle (IGCC) technology to generate 400 megawatts (gross) of electric power from coal and will put 130 to 213 megawatts on the power grid while capturing approximately 90 percent of its carbon dioxide (CO 2 ) emissions. The project will sequester approximately 2.5 to 3.0 million tons (2.3 to 2.7 million metric tonnes) of CO 2 per year. The CO 2 will be delivered through a regional pipeline network to existing oil fields in the Permian Basin of West Texas for use in enhanced oil recovery (EOR) by third-parties. The plant will also produce urea, argon, and sulfuric acid for sale in commercial markets. Because of its multiple products, the facility is referred to as a polygeneration (polygen) plant. The plant will be built on a 600-acre