International trade · 13/01/2010
Extension of Time Limits for Preliminary Results of Antidumping Duty Administrative Review of Light-Walled Rectangular Pipe and Tube from Turkey
The US government has extended time limits for preliminary results of an antidumping duty administrative review of light-walled rectangular pipe and tube imports from Turkey, as part of an ongoing investigation into the importation of these products.