Bezpieczeństwo i regulacje · 31.03.2010
Drawbridge Operation Regulations; Hackensack River, Jersey City, NJ, Maintenance
The Commander, First Coast Guard District, has issued a temporary deviation from the regulation governing the operation of the Route 1 & 9 (Lincoln Highway) Bridge, mile 1.8, across the Hackensack River at Jersey City, New Jersey. This deviation allows the bridge owner to require a two hour advance notice for bridge openings April through September and several bridge closures to facilitate bridge painting operations. Vessels that can pass under the draw without a bridge opening may do so at all times.