Regulacje i polityka gospodarcza · 20.12.2024
Pick-Sloan Missouri Basin Program-Eastern Division-Rate Order No. WAPA-217
The extension of the Upper Great Plains (UGP) region's existing Pick-Sloan Missouri Basin Program--Eastern Division (P-SMBP-- ED) transmission and ancillary services formula rates has been confirmed, approved, and placed into effect on an interim basis. The existing formula rates under Rate Schedules WAUGP-ATRR (Annual Transmission Revenue Requirement), WAUGP-AS1 (Scheduling, System Control, and Dispatch Service), WAUW-AS3 (Regulation and Frequency Response Service), WAUW- AS4 (Energy Imbalance Service), WAUW-AS5 (Operating Reserve--Spinning Reserve Service), WAUW-AS6 (Operating Reserve--Supplemental Reserve Service), and WAUW-AS7 (Generator Imbalance Service) are set to expire on September 30, 2025. This rate extension makes no changes to the existing formula rates and extends them through September 30, 2030.