Regulacje i polityka gospodarcza · 13.11.2023
Notice of Availability of National Transmission Needs Study
The U.S. Department of Energy (DOE) gives notice of availability of the final "National Transmission Needs Study" (Needs Study) pursuant to the Federal Power Act, which requires DOE to conduct a study of electric transmission capacity constraints and congestion every three years. The Needs Study will inform the potential exercise of DOE's National Interest Electric Transmission Corridor designation authority and the use of other DOE authorities and funding related to electric transmission.