Energia i regulacje · 3.04.2024
Interim Staff Guidance: Advanced Reactor Content of Application Project Chapter 12, Post-Manufacturing and Construction Inspection, Testing, and Analysis Program
The U.S. Nuclear Regulatory Commission (NRC) is issuing Interim Staff Guidance (ISG) DANU-ISG-2022-06, Chapter 12, "Post- manufacturing and construction Inspection, Testing, and Analysis Program." The purpose of this ISG is to provide guidance for prospective applicants in preparing applications for non-light water reactor (non-LWR) designs that use the Licensing Modernization Project (LMP) process and to assist the NRC staff in determining whether such applications meet the minimum requirements for construction permits, operating licenses, combined licenses, manufacturing licenses, standard design approval, or design certifications.