Regulacje i polityka gospodarcza · 21.11.2022
Pick-Sloan Missouri Basin Program-Eastern Division-Rate Order No. WAPA-203
The formula rates for the Upper Great Plains Region (UGP) Pick-Sloan Missouri Basin Program--Eastern Division (P-SMBP--ED) firm power service, firm peaking power service, and sale of surplus products have been confirmed, approved, and placed into effect on an interim basis (Provisional Formula Rates). These new formula rates replace the existing formula rates for these services under Rate Schedules P-SED- F13, P-SED-FP13, and P-SED-M1, which expire on December 31, 2022. The P-SMBP--ED firm power service composite rate is increasing 16.3 percent. There are no changes to the formula rate for sale of surplus products.