Regulacje i polityka gospodarcza · 22.08.2019
Federal Plan Requirements for Municipal Solid Waste Landfills That Commenced Construction On or Before July 17, 2014, and Have Not Been Modified or Reconstructed Since July 17, 2014
In this action, the U.S. Environmental Protection Agency (EPA) proposes a federal plan to implement the Emission Guidelines and Compliance Times for Municipal Solid Waste Landfills (2016 MSW Landfills EG) for existing MSW landfills located in states and Indian country where state plans or tribal plans are not in effect. This proposed MSW Landfills Federal Plan includes the same elements as required for a state plan: Identification of legal authority and mechanisms for implementation; inventory of designated facilities; emissions inventory; emission limits; compliance schedules; a process for the EPA or state review of design plans for site-specific gas collection and control systems (GCCS); testing, monitoring, reporting and record keeping requirements; public hearing requirements; and progress reporting requirements. Additionally, this action summarizes implementation and delegation of authority of the MSW Landfills Federal Plan.