Regulacje i polityka gospodarcza · 12.12.2018
Proposed Modification to National Pollutant Discharge Elimination System (NPDES) General Permit for Stormwater Discharges From Construction Activities
All ten Environmental Protection Agency (EPA) Regions today are proposing for public comment a modification to the 2017 National Pollutant Discharge Elimination System (NPDES) general permit for stormwater discharges from construction activities, also referred to as the "2017 Construction General Permit (CGP)" or "2017 CGP" which became effective on February 16, 2017. The EPA is proposing a modification to the 2017 CGP that is limited to clarifying the intent of several requirements and ensuring consistency with the Construction and Development Effluent Limitations Guidelines and New Source Performance Standards. This action is hereafter referred to as the "proposed modification" or "draft modified permit." The proposed modification, if finalized, would replace several existing conditions in the 2017 CGP and relevant fact sheet sections subject to modification, but would not affect any other terms and conditions of the existing permit, including: The eligible coverage area; the number or type of entities eligible to be covered by the permit; nor the five-year permit term of the current 2017 CGP, which will expire on February 16, 2022. The current 2017 CGP remains in effect while th