Energia i regulacje · 17/05/2019
Nuclear Regulatory Commission Withdraws Final Interim Staff Guidance on Probabilistic Risk Assessment for New Reactor Digital Instrumentation and Control
The Nuclear Regulatory Commission (NRC) is withdrawing its Final Interim Staff Guidance DI&C-ISG-03, which provided guidance on probabilistic risk assessment for new reactor digital instrumentation and control, as it is no longer necessary with the issuance of Revision 3 to Section 19.0 of NUREG-0800 in January 2016.