Rolnictwo i żywność · 23.10.2019
Cardinal-Hickory Creek 345-kv Transmission Line Project
Notice is hereby given that the Rural Utilities Service (RUS) has prepared a Final Environmental Impact Statement (EIS) to meet its responsibilities under the National Environmental Policy Act (NEPA) and the Code of Federal Regulations related to providing financial assistance to Dairyland Power Cooperative (DPC) for its share in the construction of a proposed 345-kilovolt (kV) transmission line and associated infrastructure connecting the Hickory Creek Substation in Dubuque County, Iowa, with the Cardinal Substation in the Town of Middle, Wisconsin (near Madison, Wisconsin). The Project also includes a new intermediate 345/138-kV substation near the Village of Montfort in either Grant County or Iowa County, Wisconsin. The total length of the 345-kV transmission lines associated with the proposed project will be approximately 100 to 125 miles, depending on the final route. DPC, along with the two other project participant utilities, American Transmission Company LLC, and ITC Midwest LLC (together the Utilities) have identified proposed and alternate segments and locations for transmission lines and associated facilities and for the intermediate substation. DPC is requesting RUS to