Regulacje i polityka gospodarcza · 22/09/2017
Drawbridge Operation Regulation; Napa River, Vallejo, CA
The Coast Guard has issued a temporary deviation from the operating schedule that governs the Mare Island Drawbridge across the Napa River, mile 2.8 at Vallejo, CA. The deviation is necessary to allow the community to participate in the Waterfront Weekend Triathlon. This deviation allows the bridge to remain in the closed-to-navigation position during the deviation period.