Regulacje i polityka gospodarcza · 09/09/2016
WAPA Proposes Extension of Washoe Project Rate
The Western Area Power Administration (WAPA) is requesting an extension of the existing Washoe Project, Stampede Division, non-firm power formula rate through September 30, 2022, replacing the existing Rate Schedule SNF-7, which expires on September 30, 2017.