Bezpieczeństwo i regulacje · 18.05.2016
Drawbridge Operation Regulation; Lake Champlain, North Hero Island, VT
The Coast Guard has issued a temporary deviation from the operating schedule that governs the US2 Bridge across Lake Champlain (The Gut), mile 91.8, between North Hero and South Hero Island, Vermont. This deviation is necessary to allow the bridge owner to perform mechanical and electrical repairs at the bridge.