Bezpieczeństwo i regulacje · 26.06.2015
Drawbridge Operation Regulation; Charles River, Boston, Massachusetts
The Coast Guard has issued a temporary deviation from the operating schedule that governs the Craigie Bridge, across the Charles River, mile 1.0, at Boston, Massachusetts. This deviation is necessary to facilitate the Boston Pops Fireworks Spectacular. This deviation allows the bridge to remain in the closed position during this public event.