Regulacje i polityka gospodarcza · 30.10.2013
EPA-R04-OAR-2013-0563; FRL-9902-18-Region 4]
EPA is proposing to approve the State of North Carolina's March 27, 2013, State Implementation Plan (SIP) revision to the State's approved Maintenance Plan for the Raleigh-Durham-Chapel Hill (Triangle) 1997 8-hour Ozone Maintenance Area. Specifically, North Carolina's revision, including updated modeling, shows that the Triangle Area would continue to maintain the 1997 8-hour ozone standard if the currently applicable Federal Reid Vapor Pressure (RVP) standard for gasoline from 7.8 pounds per square inch (psi) were modified to 9.0 psi for three portions (Wake and Durham Counties, and a portion of Granville County) of the "Triangle Area" of North Carolina during the high-ozone season. The State has included a technical demonstration with the revision to demonstrate that a less-stringent RVP standard of 9.0 psi in these areas would not interfere with continued maintenance of the 1997 8-hour Ozone National Ambient Air Quality Standards (NAAQS) or any other applicable standard. Approval of this SIP revision is a prerequisite for EPA's consideration of an amendment to the regulations to remove the aforementioned portions of the Triangle Area from the list of areas that are currently sub