Bezpieczeństwo i regulacje · 11.09.2014
Drawbridge Operation Regulation; Thames River, New London, CT
The Coast Guard proposes to change the operating schedule that governs the Amtrak Bridge across the Thames River, mile 3.0, at New London, Connecticut. Under this notice of proposed rulemaking the bridge would open to 75 feet above mean high water instead of the full open position of 135.3 feet unless a full bridge opening is requested. It is expected that this change to the regulations will create efficiency in drawbridge operations while continuing to meet the reasonable needs of navigation.