Środowisko i energia · 28.01.2010
Modification to 2008 National Pollutant Discharge Elimination System (NPDES) General Permit for Stormwater Discharges Associated With Construction Activities
EPA Regions 1, 2, 3, 5, 6, 7, 8, 9, and 10 today are modifying the 2008 National Pollutant Discharge Elimination System (NPDES) general permits for stormwater discharges associated with construction activity in order to extend by one year the expiration date of the permit. Hereinafter, these NPDES general permits will be referred to as "permit" or "2008 construction general permit" or "2008 CGP." The 2008 CGP was originally issued for a period of two (2) years. Today, EPA is modifying the CGP in order to extend the 2 year term of the 2008 CGP by one year so that it expires on June 30, 2011, instead of June 30, 2010, resulting in a permit that will be in effect for a total period of three (3) years. By Federal law, no NPDES permit may be issued for a period that exceeds five (5) years.