BN Business News
Add your company to Business Communicator →

Regulacje i polityka gospodarcza · 25/09/2009

Notice of Availability for the Final Environmental Impact Statement/Environmental Impact Report and a Draft General Conformity Determination for the San Pedro Waterfront Project, Port of Los Angeles, Los Angeles County, CA

On September 22, 2008, the U.S. Army Corps of Engineers, Los Angeles District, Regulatory Division (Corps) in coordination with the Los Angeles Harbor Department (LAHD) completed and published the Draft Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for the San Pedro Waterfront Project (Project) in the Port of Los Angeles. The Corps and LAHD considered all comments received in preparing the Final EIS/EIR, which is available for a 30-day review. The Final EIS/ EIR includes a draft general conformity determination (see Section 3.2 and Appendix D.7), pursuant to Section 176(c) of the Clean Air Act. A general conformity determination is necessary because Project construction would require Federal action (i.e., issuance of a Corps permit for activities proposed in and over navigable waters and waters of the U.S.) and not all the Federal action's direct and indirect emissions would be below specified de minimis thresholds (40 CFR 93.153(b)). Pursuant to the general conformity regulations (40 CFR part 93, subpart B), general conformity determinations do not have to be included in the EIS and can be separately noticed, but the draft general conformity determination fo

Source: Federal Register — All DocumentsOpen original release →