I-5 Corridor Reinforcement Project

BPA intends to prepare an EIS in accordance with the National Environmental Policy Act (NEPA) on the construction, operation, and maintenance of a proposed 500-kilovolt (kV) transmission line and associated substations. The project would be located in Cowlitz and Clark counties, Washington, and Multnomah County, Oregon. The new BPA transmission line would extend generally southeast from a new substation proposed near Castle Rock in Cowlitz County, Washington (referred to as Castle Rock Substation), to a new substation proposed near BPA's existing Troutdale Substation near the city of Troutdale in Multnomah County, Oregon. Multiple preliminary transmission line route segments have been identified that, when combined, result in various transmission line routing alternatives approximately 70 miles long. The proposed transmission line and substations are needed to help ease transmission system congestion in the southwest Washington and northwest Oregon area, allowing BPA to fulfill existing and new transmission service requests for existing and new generation; improve system reliability; and meet continued electric load growth. With this NOI, BPA is initiating the public scoping proces

Source: Federal Register — All DocumentsOpen original release →