Regulacje i polityka gospodarcza · 28.11.2008
Notice of Availability for the Final Supplemental Environmental Impact Statement/Subsequent Environmental Impact Report for the Pacific L.A. Marine Terminal LLC Crude Oil Terminal Project, Los Angeles County, CA
The U.S. Army Corps of Engineers, Los Angeles District (Regulatory Division), in coordination with the Port of Long Angeles, has completed a Final Supplemental Environmental Impact Statement/ Subsequent Environmental Impact Report (SEIS/SEIR) for the Pacific L.A. Marine Terminal LLC Crude Oil Terminal Project. The Port of Los Angeles requires authorization pursuant to Section 404 of the Clean Water Act and Section 10 of the River and Harbor Act to build a new crude oil marine terminal at Berth 408 on Pier 400 including: construction of a new marine terminal to receive crude oil from marine vessels and transfer the oil to tank farms facilities via a new 42-inch-diameter, high-volume pipeline; construction of two tank farms, Tank Farm Site 1 located on Pier 400 and Tank Farm Site 2 located on Pier 300 at Seaside Avenue/Terminal Way; construction of new pipelines to connect the new tank farm facilities to existing pipeline facilities, with the new tank farm facilities connected to the existing ExxonMobil Southwest Terminal on Terminal Island, the existing Ultramar/Valero Refinery on Anaheim Street near the Terminal Island Freeway, and to Plains All American pipeline systems near Henry