Regulacje i polityka gospodarcza · 22.12.2008
Revision of Class E Airspace; Toksook Bay, AK
This action revises Class E airspace at Toksook Bay, AK to provide adequate controlled airspace to contain aircraft executing Standard Instrument Approach Procedures (SIAPs). One SIAP is being amended for the Toksook Bay Airport. Additionally, one textual Obstacle Departure Procedure (ODP) is being amended. This action revises existing Class E airspace upward from 700 feet (ft.) and 1,200 ft. above the surface at Toksook Bay Airport, Toksook Bay, AK.