BN Business News
Add your company to Business Communicator →

Regulacje i polityka gospodarcza · 29.08.2007

Dry Fork Station and Hughes Transmission Project

Notice is hereby given that the Rural Utilities Service (RUS), an agency delivering the United States Department of Agriculture (USDA) Rural Development Utilities Programs, hereinafter referred to as Rural Development, is issuing a Draft Environmental Impact Statement (EIS) for the Dry Fork Station and Hughes Transmission Project. The Draft EIS was prepared pursuant to the National Environmental Policy Act of 1969 (NEPA) (U.S.C. 4231 et seq.) in accordance with the Council on Environmental Quality (CEQ) regulations for implementing the procedural provisions of NEPA (40 CFR 1500-1508) and RUS regulations (7 CFR part 1794). The purpose of the EIS is to evaluate the potential environmental impacts of and alternatives to the Basin Electric Power Cooperative, Inc. (Basin Electric) application for a Rural Development loan guarantee to construct and operate a coal-fired electric generation facility referred to as the Dry Fork Station, consisting of a single maximum net 385 Megawatt (MW) unit, at a site near Gillette, Wyoming, along with other proposed pollution controls collectively known as Best Available Control Technology (BACT). In addition, Basin Electric also proposes to construct a

Source: Federal Register — All DocumentsOpen original release →