BN Business News
Add your company to Business Communicator →

Regulacje i polityka gospodarcza · 26/11/2007

Intent To Prepare an Environmental Impact Statement for Proposed Transit Improvements in the Draper Corridor of Metropolitan Salt Lake City, UT

The Federal Transit Administration (FTA) and Utah Transit Authority (UTA) intend to prepare an Environmental Impact Statement (EIS) to evaluate proposed public transportation improvements to extend fixed guideway transit service through the cities of Sandy and Draper to the southernmost part of Salt Lake County, Utah. The Wasatch Front Regional Council (WFRC) has adopted a long-range transportation plan, which is a comprehensive system plan and includes the full build-out of public transportation improvements in several corridors. The general alignments of the corridors have been identified in the approved plan. The Draper Transit Corridor has been identified in the plan as a two- track extension of the existing North-South Light Rail Transit (LRT) line from its current terminus at 10000 South in Sandy to about 14600 South in Draper along the UTA owned right-of-way. The Draper Transit Corridor Project, as defined in the WFRC long-range plan, was identified as the preferred alternative at the conclusion of a locally prepared alternatives analysis. The EIS will build on the results of the local alternatives analysis and evaluate other reasonable alternatives in accordance with approp

Source: Federal Register — All DocumentsOpen original release →