BN Business News
Add your company to Business Communicator →

Regulacje i polityka gospodarcza · 19.10.2006

Drawbridge Operation Regulations; Thames River, New London, CT

The Coast Guard proposes to temporarily change the drawbridge operating regulations governing the operation of the Amtrak Bridge across the Thames River, mile 0.8, at New London, Connecticut. This notice of proposed rulemaking (NPRM) would allow the bridge owner to open the bridge on a temporary opening schedule from November 15, 2006 through May 15, 2007. This proposed rule is necessary to facilitate bridge pier repairs.

Source: Federal Register — All DocumentsOpen original release →