Regulacje i polityka gospodarcza · 16/11/2006
Drawbridge Operation Regulations; Thames River, New London, CT
The Coast Guard has temporarily changed the drawbridge operation regulations that govern the Amtrak Bridge across the Thames River, mile 0.8, at New London, Connecticut. This temporary final rule allows the bridge owner to open the bridge on a temporary opening schedule from November 15, 2006 through May 15, 2007. This temporary final rule is necessary to facilitate bridge pier repairs.