Energia i regulacje · 27.11.2006
Notice of Availability of Model Application on Technical Specification Improvement To Modify Requirements Regarding LCO 3.10.1, Inservice Leak and Hydrostatic Testing Operation Using the Consolidated Line Item Improvement Process
Notice is hereby given that the staff of the Nuclear Regulatory Commission (NRC) has prepared a model licensee application relating to the modification of shutdown testing requirements in technical specifications (TS) for Boiling Water Reactors (BWR). The purpose of this model is to permit the NRC to efficiently process amendments that propose to modify LCO 3.10.1, and the associated Bases, to expand its scope to include provisions for temperature excursions greater than [200][deg]F as a consequence of inservice leak and hydrostatic testing, and as a consequence of scram time testing initiated in conjunction with an inservice leak or hydrostatic test, while considering operational conditions to be in Mode 4. Licensees of nuclear power reactors to which the model applies could then request amendments, confirming the applicability to their reactors.