Bezpieczeństwo i regulacje · 31.10.2005
Drawbridge Operation Regulations: Saugus River, MA
The Coast Guard has temporarily changed the drawbridge operation regulations that govern the operation of the General Edwards SR1A Bridge, at mile 1.7, across the Saugus River between Lynn and Revere, Massachusetts. This temporary change to the drawbridge operation regulations allows the bridge to remain in the closed position from November 1, 2005 through April 30, 2006. This action is necessary to facilitate structural maintenance at the bridge.