Bezpieczeństwo i regulacje · 4.05.2004
Drawbridge Operation Regulations; Hutchinson River, NY
The Coast Guard proposes to change the drawbridge operating regulations governing the operation of the Pelham Parkway Bridge, mile 0.4, across the Hutchinson River, New York. This change would allow the bridge owner to require a thirty-minute advance notice for bridge openings between 6 a.m. and 7 p.m. from July 1, 2004 through May 1, 2005. This action is necessary to facilitate bridge painting operations.