BN Business News
Add your company to Business Communicator →

Bezpieczeństwo i regulacje · 18.06.2004

Drawbridge Operation Regulations; Connection Slough, Stockton, CA

The Coast Guard has revised its proposal to amend the regulations governing the operation of the Connection Slough Drawbridge. The revised proposal reopens the comment period. It emphasizes the continued availability of the drawspan to open for vessel passage, at any time, with advance notice dates and times adjusted, to coincide with documented seasonal reductions in navigation on the waterway. The proposal would ensure a bridge operator is present during identified increased navigation periods, and reduce the hours a drawbridge operator is required to be at the drawbridge and not gainfully employed.

Source: Federal Register — Homeland SecurityOpen original release →